IBM Maximo
Two Zones and One Arrow: A Six-Exercise Maximo Integration Lab, and the JMS Server Hiding in the Prerequisites
A six-exercise integration lab on MAS 9.2 draws a line through the estate: operational data on one side, business records on the other, and one arrow where an alert becomes a service request. The most useful part is the eleven-minute gap between saving an asset and delivering it.